- Description:
-
The Contractor's scope of services includes in particular the installation of a Structural Health Monitoring System (SHM System) on the HVDC platforms.
On the HVDC platforms BorWin alpha, BorWin beta, BorWin gamma, DolWin alpha, DolWin beta, DolWin gamma, HelWin alpha, HelWin beta and SylWin alpha which are in operation, the installation of the SHM system offshore shall be carried out during operation. For the HVDC platforms BorWin epsilon, BorWin kappa and DolWin kappa, which are under construction or in the planning phase, the installation of the SHM system takes place in the respective shipyard during the construction phase. In connection with the installation of the SHM system, a platform-specific monitoring concept is to be developed that is based on periodic data determination. Therefor periodic reporting should be implemented. In addition to the immediate detection of beyond-design-basis events and changes in the foundation structure, this should also enable the total service life of the structures to be recorded mathematically.
Please consider all documents provided on Negometrix!
In order to protect the confidentiality of information provided by the Principal in the tender documents, a non-disclosure agreement needs to be concluded. Please use the "NDA" document provided for download and send the signed NDA to the following e-mail address: carsten.heinrich@tennet.eu.
After approval of the NDA the bidder will be added to the tender in Negometrix.
From this, the bidder can not yet deduce that the Principal certifies the suitability of the bidder for further participation in the tendering process.
After expiry of the call for competition the Principal will invite the approved bidder separately to submit an offer.
Please consider all documents provided on Negometrix. The application has to be handed in via Negometrix latest until:
Date: 15. October 2021 Local Time: 09:00 o`clock (CET)
Individual extensions of time will not be granted. A submission of the application by post or fax is not permitted. A violation of this requirement may lead to the exclusion of the application in the tendering process.
- Documents:
-
- Type:
- Sealed with Preselection
- Published on:
- 14 Sep 2021 9:11
- Selection phase:
- 9 Sep 2021 13:00 — 15 Oct 2021 9:00
|