- Description:
-
Offshore wind plays a crucial role in the energy transition. In a growing trend towards more sustainable energy, TenneT is preparing for the new climate targets.
TenneT aims to realize and maintain several 2 GW connections for the supply of electricity in the Netherlands and Germany.
The scope includes 525 kV cable connections, amongst others cable connections between offshore DC platforms and landstations. Furthermore onshore connections at 525 kV DC between one or more landstations, Multi-Purpose Interconnector (MPI) projects at 525 kV DC and connections between one or more offshore platforms are part of the scope.
Each Offshore Grid Connection System receives up to 2GW of 66kV (or higher) electricity generated by offshore windfarms, which must be converted offshore from AC to DC. Via 525 kV cables the DC power is transported to shore, where the DC is to be converted back to AC to enable transportation on the AC onshore grid.
The scope may include projects in the Netherlands and Germany in the field of offshore, nearshore, inshore and onshore.
The scope of this Qualification System may include the following activities: design, engineering, production, transportation, delivery, assembly, supervision of cable laying, testing, installation and commissioning of 525 kV DC cable systems in order to build and maintain Grid Connection Systems.
The earlier qualification systems for NL (no. 171671) an Germany (no. 192897) are terminated and replaced by this Qualification System. In order to be eligible for an invitation to a specific tender for the scope of works as specified above, the Candidate must apply for this Qualification System.
In order to ensure that your application is received and reviewed in time to enable participation in the first tender, you are kindly requested to submit your application to 207131 Qualification System at your earliest convenience, but no later than October 21th 2022.
Each qualified Candidate of the 171671 Qualification System (525 kV DC Cable & Installation of Dutch 2GW Projects) and the 192897 Qualification System (525 kV DC Cable & Installation of German 2 GW Projects) that wants to apply for the 207131 Qualification System has to declare that all requirements from 171671 Qualification System and or 192897 Qualification System are still met and no material changes have occured in the application and the submitted documents by the Candidate and has to upload additional documents.
All communication regarding the qualification procedure will be handled through Negometrix.