TenneT, as the offshore grid operator in the German as well as the Dutch part of the North Sea, is responsible for the design, fabrication, installation and operation of the grid connections (offshore high voltage stations) which will transport the wind energy generated offshore to shore. TenneT recently has seen a significant increase in offshore wind targets resulting in a very large portfolio. Also subsequently a continuous realization pace is expected of multiple offshore grid connections every year.
Background / Target Therefore TenneT plans to establish a framework agreement with service providers (third party) for supervision of cable production at the manufacture site(s). This service compromises the production monitoring and reviews, regular reporting and quality assurance of different cable and accessories during the production. Target is to ensure the high quality standard and prober working of the equipment. The supervision will be carried out at the production site of the manufacturers and ensure an independent proof of functionality, quality and integrity of cables.
The tender team wants to consult the market regarding available capacity, safety concepts, scheduling and tender resources.
Disclaimer - The market investigation procedure serves to prepare the decision of the transmission system operators (TSOs) as to whether, in what form and with what requirements a competitive, transparent and non-discriminatory award procedure could be carried out.
- The TSOs are not bound by the results of the market investigation. In particular, there is thus no entitlement to the performance of the award procedure in a specific form or with a specific content or to the subsequent award of a contract. This market investigation is not a procedure which already has the purpose and/or effect of awarding a contract. It merely serves as preparation.
- Participation in the market investigation is voluntary and at the customer's own expense. Participation or non-participation in the market investigation does not imply any entitlement to or any pre-determination of participation or non-participation in a subsequent award procedure. Participation in any subsequent award procedure shall be based solely on the criteria applicable to such subsequent procedure.
- The TSO treat the documents submitted by you and the trade and business secrets contained therein confidentially in accordance with Section 5 of the Sector Ordinance (SektVO).
All communication regarding this Market Consultation Round will be handled through Negometrix.
By answering the following questionnaire, you will help us to understand your market perspective on intersections, bundling and expansion potentials within your service portfolio. The data you provide will be treated by us with the strictest confidentiality and exclusively for internal purposes.
The completion of the survey will take approximately 30 minutes.