UPDATE DECEMBER 2023:
Please note that this Qualification System has been moved to the tender platform Source-to-Contract, and can be found here: https://s2c.mercell.com/today/55530
The qualification system will no longer be accessible in Negometrix from Q1 2024, but it will continue in Source-to-Contract.
In case of any questions, please contact erik.meulepas@tennet.eu
---------------------
TenneT is responsible for the majority of the Dutch offshore grid and part of the German offshore grid. In this role, TenneT is responsible for the design, fabrication, installation and operation of the grid connections which will transport offshore generated power to shore. For such grid connections, TenneT has developed two standard platform concepts up to the level of basic design; a 700MW AC offshore substation and a 2GW DC offshore converter station.
The offshore platforms that are to be realized need to be certified in accordance with applicable technical standards. The correct implementation of these standards into the design and the actual execution of the works is part of the responsibility of the stations contractor.
With this Qualification System, TenneT aims to qualify candidates that are capable of acting as a certifying authority for 2GW offshore stations and / or 700 MW offshore substations, and review the design and execution of the work of the stations contractor to ensure compliance with the DNV standard DNV-ST-0145, and certify the platform according service specification DNV-SE-00073/DNV-SE-00190 for Dutch offshore stations, and BSH 7005 for German offshore stations.