72969 Design&Construct CO2 capture

Buyer

Twence BV http://www.twence.nl
Lead buyer
Contact person:
User Photo

Erik Meutstege linkedin

06 11877698

E.Meutstege@twence.nl

Information

Description:
The scope of the tender will focus on the following aspects (lump sum turn key design&construct):
  • CO2 capture with Quench, absorption and desorption process including appendages, piping and all the utilities
  • Integration with WtE plant 3 flue gas treatment
  • Electrical and Instrumentation (including process control, standard DCS)
  • Civil and infrastructural works
  • Overall project coordination including interface management and HSE supervision
  • Multi solvent use
  • Integration with existing steam / heat distribution
  • process responsibility and design responsibility
 
Details will be shared and provided during the bidding phase (following this prequalification phase) in an extensive BoD document. Twence reserves the right to exclude some parts of the project to be carried out under a separate agreement. E.g. DCS integration and / or  Flue gas interfacing. This will be described during the bidding phase.

Optional scope:
  • Liquefaction and storage buffers of the CO2, depending on the outcome of tender 62069 (Concurrentiegerichte dialoog Afzet CO2)
  • Optimization related to the TCO and sustainable solutions
  • Extension of scope to include full CO2 capture at WtE line 3 as well as future CO2 capture at WtE lines 1 and 2 and / or at the biomass energy plant, based on similar technology
  • Maintainance contract for the period of the technical and economic life cycle
Type:
Sealed with Preselection
Published on:
1 Nov 2017 8:23
Selection phase:
1 Nov 2017 8:22 — 1 Dec 2017 14:00

Navigation

Forgot password?

Forgot username?

Register company

Need help using Negometrix3? Visit our support page Help
Negometrix Platform v4.5.2410.0, Page times (ms) Server init:0 load:58 prerender:63 Total:68 Browser , (3.144.4.60 - 6)