- Description:
-
This assignment concerns the licence, delivery and installation, support, training and maintenance for a Ground-based Safetey Nets system.
Introduction The purpose is to arrive at a full implementation of Safety Nets, including Short-Term Conflict Alert (STCA) and Non-Transgression Zone intrusion alert (NTZ) at ATC-NL for iCAS.
Background In the coming years, in joint cooperation with Deutsche Flugsicherung (DFS), ATC-NL aims at the commissioning of the next-generation air traffic management system. As part of this goal, ATC-NL's current main system for air traffic control, named AAA, is replaced by a new system called iCAS.
Currently, Short-Term Conflict Alert (STCA) and Non-Transgression (NTZ) are implemented in AAA and are thus no longer available when AAA will be replaced by iCAS. Hence there is a need for a new STCA and NTZ functionality at ATC-NL.
STCA in AAA is currently operationally displayed to Area Control Centre (ACC) controllers and Military (MIL) controllers. The ATM Masterplan states an intended implementation/activation of STCA for Approach Control (APP) as soon as possible after iCAS migration.
Strategy The strategy behind the implementation of Safety Nets at ATC-NL is based on the following considerations: - The Safety Nets system shall include STCA for ACC- and MIL and NTZ for APP-functionality;
- The Safety Nets system shall be implemented on ATC-NL hardware and (network) infrastructure;
- Installation, initial tuning, site acceptance (SAT), tuning and operational acceptance shall take place at ATC-NL's Development & Test environment for iCAS applications;
- The supplier of the Safety Nets system shall be responsible for delivery of the system until SAT results have been accepted by ATC-NL;
- The supplier of the Safety Nets system shall provide ATC-NL support during the fine tuning and operation acceptance.
Main deliverables The supplier of the Safety Nets system shall be responsible for the delivery of: - A licence to use the Safety Nets software and Safety Nets support tools;
- Delivery and installation (basic tuning) of the Safety Nets software;
- Support for fine tuning, validation and operational acceptance of the Safety Nets software;
- Training for operational and technical personnel;
- Support and maintenance (bug fixing, patches/updates).
Project structure of Safety Nets After the procurement phase, implementation of the Safety Nets system will be structured in the following project phases: - Project Initiation
- Installation, initial tuning and site acceptance
- Fine tuning and operational acceptance
After phase 3, the project activities will be concluded and the system handed over to the ATC-NL's operational (OPS) and technical support (Monitoring, Maintenance & Control, MMC) departments. The supplier is expected to deliver Support and Maintenance to these departments.
- Type:
- Sealed with Preselection
- Published on:
- 19 Jan 2018 9:33
- Selection phase:
- 19 Jan 2018 9:59 — 19 Feb 2018 12:00
|